Lake Tyrone
Lake Tyrone Improvement Board
The Lake Tyrone Improvement Board (LTIB) was established under Part 309 of the Natural Resources and Environmental Protection Act (NREPA). Formation of the LTIB was initiated by petition of the residents in 2003. The Board holds public hearings to establish a lake improvement project based on the needs of the lake and feedback from the residents. A lake improvement project could include various activities such as control of nuisance aquatic plants, dredging, engineering studies, plant surveys, aeration, etc. The Board is responsible for managing the activities of the approved lake management project.
Dam & Lake Details
Photos, maps, lake levels, and other information about lakes and dams.
Projects
Lake Tyrone residents have previously petitioned separately for two different projects.
- Weed Control – This project includes weed control based on lake surveys and recommendations of the lake management consultant. The project was originally initiated by petition in 2003 and was recently extended through 2026.
- Aeration – This project includes installation of an aeration system, bio augmentation, ongoing operation and maintenance of the system, and sampling in accordance with the EGLE permit. The project was initiated by petition in 2015 and will extend through 2026.
The most recent public hearings were held on May 1, 2024. The confirmed assessment roll from those hearings is listed below.
2024-2026 Weed/Algae Control and Aeration Program Confirmed Special Assessment Roll
2024-2026 Weed/Algae Control and Aeration Program Confirmed Special Assessment Roll
Meetings
The LTIB meets on an as-needed basis. Meeting notices are posted on the Drain Commissioner’s website, at the Township Halls, and at the County Administration Office. As we reach the end of the projects, the LTIB will hold hearings to determine if each project should continue. Residents will also be notified of the hearings by letter sent via first class mail.
Upcoming Meeting: No meetings scheduled at this time.
Last Improvement Board Meeting: Tuesday, March 3, 2026 at 10:00am located at Hartland Township Hall, 2655 Clark Road, Hartland, Michigan 48353.
The Confirmed Lake Tyrone Improvement Assessment Roll is listed below. The roll is also available for viewing at the Livingston County Drain Commissioner’s Office located at 2300 East Grand River, Howell, Michigan 48843.
Scheduled Lake Treatments
No schedule at this time.
Resources
Lake Reports
- 2025 Annual Report
- 2024 Annual Report
- 2024 Lake Management Plan
- 2024 Project Options Survey
- 2023 Annual Report
- 2023 Lake Management Survey
- 2022 Lake Management Plan
- 2022 Annual Report
- 2021 Lake Management Report
- 2020 Lake Management Survey
- 2020 Lake Management Update
- 2019 Lake Management Survey
- 2018 Lake Tyrone Study
- 2018 Annual Report
- 2017 Annual Report
- 2016 Annual Report
- 2015 Annual Report
- 2014 Feasibility Study
- 2011 Limnological and Fisheries Survey
Educational Documents
Budget
| Weed/Algae Control and Aeration Program | |
|---|---|
| 3-year budget | $457,831.88 |
| Annual assessment per property | $803.21 |
Archive


